Search Blog Posts

Production Schedule

Production plan - Deadline - 6th December

So far our template is complete and optimized for search engines and tested on all browsers, and mac and pc operating systems. 

17th Discuss our plan
Now we have our simplictic layout and easy to navigate website we can break down the areas that we need to work on. 

24th Website Structure
Figure out our website structure, page depths etc navigation, Decide on a website name.

31st Figure out the text to be used
Discuss all relevant areas and finalise text to be used in the website. Designing the text with a creative attitude and persuasive approach.

Sort out all of the images, compress crop and edit so they can be added next week.

7th Create the website using our template made a few weeks ago.
Add the text images and create the website,

14th Make site live.
Make website live upload and test every image text and look through code to insure that every aspect is perfect.

21st
Period for any other work left

28th
Design cover and case for our Hand in cd, Burn website to disc.

5th
Sit back and relax

6th Dec
Present our company to the audience

Tags:

Post this story to Delicious Post this story to Digg Post this story to Technorati Post this story to SumbleUpon Post this story to Facebook Post this story to Reedit

Leave a Comment

  1. XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

© Copyright 2003-2008 Minimalistic Designs | Terms | Links | Sitemap
Website Design Liskeard - www.minimalistics.co.uk